|
 |
In August, 2012, the club had a local excavator rework and regravel our drive and the shooting bays. |
 |
 |
Before the work |
After the work |
 |
 |
 |
Cowboy Action Bay (lower) c. 2005 |
Cowboy Action Bay Aug 2012 |
 |
 |
 |
Action Pistol Bay #1, c. 2005 |
Action Pistol Bay #1, Aug 2012 |
 |
 |
 |
Action Pistol Bay #2, c. 2005 |
Action Pistol Bay #2, Aug 2012 |
 |
 |
Regraveled middle drive |
|